Mine conveyor head wellhead assembly
The company mainly produces: 75, DTII and DTII(A) belt conveyors; DJ large inclination angle, DJII large inclination angle; D-YM96 typical coal conveyor, DTL mine fixed conveyor, DSJ mine telescopic conveyor; Round tube belt conveyor; Light and heavy unloading vehicles, shuttle feeder, reversible bin distribution, plough unloader, buffer bed, conveyor deflection adjustment device; Conveying machinery and accessories such as rollers and rollers.
If you are still hesitant to find special gasesContact us immediately!
Product category:
Product label:
Product Details
Mining conveyor plays an important role in the mining field, and the assembly of the head wellhead is the core part of the whole conveying system. In order to ensure the safety and efficiency of the head assembly, the following is a detailed introduction to the professional process and key elements of the head wellhead assembly.
1. professional process
1. Preliminary preparation: collect relevant drawings and technical documents, conduct site survey to ensure clean and barrier-free environment. At the same time, prepare the required tools, equipment and accessories.
2. Foundation acceptance: the wellhead foundation shall be accepted to ensure that its position, size and strength meet the design requirements.
3. Assembly sequence: Assemble in the order of top to bottom, first major and then minor. Install the head of the machine first, then install the conveyor belt and other accessories.
4. Specific steps: including the head of the lifting machine, the installation of the driving device, the coupling, the brake, the protective cover, etc. At the same time, ensure that the installation position of each component is accurate and fixed firmly.
5. Electrical installation: install control box, cable, lighting and other electrical equipment to ensure correct wiring and reliable operation.
6. Debugging and testing: carry out no-load debugging and full-load testing to check the operating conditions of the conveyor to ensure that there is no abnormality.
2. key elements
1. Safety first: strictly abide by the safety operation procedures to ensure the safety of personnel and equipment.
2. Accurate installation: to ensure that the installation position of each component is accurate, to avoid deviation, so as not to affect the operation efficiency of the conveyor.
3. Quality inspection: Strict quality inspection is carried out on each installation link to ensure that the installation quality meets the standards.
4. Maintenance: regular maintenance of the conveyor to extend its service life.
Environmental factors: consider the impact of environmental factors on the conveyor, such as temperature, humidity, dust, etc., and take corresponding protective measures.
6. Personnel training: professional training for the personnel involved in the assembly, improve their skills and ensure the quality of assembly.
In short, the assembly of the head wellhead of the mining conveyor is a complex and important task, which requires strict compliance with professional procedures, attention to key elements, and ensuring safe, efficient and high-quality completion. This is not only related to the normal operation of the conveyor, but also related to the safety and efficiency of mine production. Therefore, we must attach great importance to it.
The company has a closed-loop model from design and development to the production and assembly process, with excellent products and good reputation. Main production: 75, DTII and DTII(A) belt conveyors; DJ large inclination angle, DJII large inclination angle; D-YM96 typical coal conveyor, DTL mine fixed conveyor, DSJ mine telescopic conveyor; Circular pipe belt conveyor; Light and heavy unloading vehicles, shuttle distributor, reversible bin distribution, plough unloader, buffer bed, conveyor deflection adjustment device; Conveying machinery and accessories such as rollers and idlers. Our products are of high quality and sell well in many provinces and cities across the country.
The company has strong technical force and GPRS surveying and mapping instruments, which can be independently designed for customers' on-site measurement according to the ground type. The production equipment is complete, and semi-automatic production is gradually realized in turning, punching, milling, shearing, drilling, plasma cutting, laser cutting, etc. The testing equipment is perfect, including sound level meter, axial displacement testing, cloth hardness tester, ultrasonic flaw detector, etc. Our company to technology, production, measurement of the trinity of the whole system for the majority of customers to produce many excellent products.
Free access to product information
Note: Please leave your mobile phone number and our professionals will contact you as soon as possible!
Recommend Products
The company's main products: DSJ mining conveyor, DTC mining conveyor, DTL mining conveyor, second belt conveyor, self-moving tail, unloading truck, belt conveyor, mining conveyor, tubular machine, pipe belt conveyor, buffer bed, general belt conveyor, large inclination conveyor, frame conveyor, roller, conveyor, bracket, roller, etc.